Construct a lifecycle resource and sustainability trade-off ledger

A hands-on PMP lab. You produce the real artefact and 10 automated checks verify it behaves the way the exam expects.

Try this labAll PMP practice

Certification
PMP
Format
Structured configuration
Difficulty
hard
Estimated time
40 min
Automated checks
10

The brief

Repair lifecycle-plan.json. Fictional project: 100 units,2 operating years. Products (id:capacity,lead days,purchase$,manufacturing carbon/water,annual energy/water/maintenance$): standard:100,5,500,20/10,20/10/15; efficient:80,7,700,35/15,10/5/10; refurbished:60,4,350,5/3,30/20/30 (reused). Operating energy costs $2/unit and .5 carbon/unit; water $1/unit. Transport (mode:cost/carbon per device,added lead,min units): local:10/2,0,1; consolidated:5/1,2,40. Arrival=dispatchAt+maximum selected source lead+transport lead. Year-2 retirement source T2/recovery-owner: takeback capacity100,min80,per-device cost/carbon/water 8/1/.2; landfill 2/3/0. Takeback+landfill must equal allocated units. No avoided-impact credits. Corporate hard limits: totalCost≤71000,totalCarbon≤4650,totalWater≤3520,arrival≤8. Permitted fictional sponsor policies available day0: water-first/PW targets totalWater≤2820; circular-use/PC targets reusedUnits≥50. Both retain all hard limits. Decide with sponsor and exact policy source before dispatch. allocation rows {product,units} positive integers; logistics {mode,dispatchAt}; retirement {takeback,landfill,owner,evidenceRef,atYear}; decision {policy,owner,evidenceRef,at,comparison}. report: totalUnits,purchaseCost,operatingCost,transportCost,retirementCost,totalCost,manufacturingCarbon,operatingCarbon,transportCarbon,retirementCarbon,totalCarbon,totalWater,reusedUnits,arrival. Multiply annual use/maintenance by TWO years; include manufacturing, logistics and retirement burdens. comparison: baseline:standard-local-80,costDelta,carbonDelta,waterDelta,reuseDelta. Fixed baseline is 100 standard,local,dispatch0,takeback80,landfill20. Report chosen totals minus that baseline, including unfavorable dimensions. Different quantities and recovery flows can satisfy either policy. Money 2 decimals,impacts/days 4. Save, test and repair without Reset.

What the checks verify

Your work is graded on 10 independent properties, not on matching one reference answer.

  • The allocation, lifecycle and priority records are unique, known and finite.
  • The complete required equipment population stays in the assessment.
  • The selected source quantities fit actual supplier stock.
  • Actual source and transport lead time meets delivery and shipment bounds.
  • Reported burdens reconcile across procurement, two-year operation, logistics and retirement.
  • The full lifecycle preserves independent money, carbon and water hard limits.
  • The policy decision retains the supplied sponsor, exact source and timing.
  • The selected policy's actual water or reuse result is achieved.
  • Every allocated unit has an accounted bounded year-two retirement route.
  • The decision records real favorable and unfavorable differences from a common lifecycle baseline.

Where this sits in the PMP blueprint

Domain
Business Environment
Objective
Compliance
Skill
Compliance Evidence and Consequences

Part of PMP preparation

Labs are written by ExamNova to teach the decisions the exam tests. They are not reproductions of vendor lab content.