Facilitate an evidenced migration decision and follow-up plan

A hands-on PMP lab. You produce the real artefact and 10 automated checks verify it behaves the way the exam expects.

Try this labAll PMP practice

Certification
PMP
Format
Structured configuration
Difficulty
hard
Estimated time
40 min
Automated checks
10

The brief

Repair facilitation-plan.json. Fictional sources, all available day 0 (criterion:metric,comparison,value,source,owner): units:totalUnits,eq,8,P8,product-owner; outage:maximumOutage,lte,2,O2,operations-owner; verification:minimumVerification,gte,.5,Q05,quality-owner; budget:totalCost,lte,4000,B4,sponsor; finish:finishAt,lte,8,D8,sponsor; single-window:batchCount,prefer-eq,1,C1,product-owner. Only single-window is a soft preference. Session availability: product-owner,operations-owner,quality-owner 1–3; all three required. sponsor 2–4 is optional at session and sole decision owner. Outcome review by 9. Each batch: integer units≥1; setup .25 day plus .25 day per unit, then verification≥.5 day before reopening. verifyStart=start+.25+.25×units; finish>verifyStart. Batches must not overlap. Cost=700 per batch+200 per unit. session: start,finish,participants,agenda rows {criterion,source,kind:constraint/preference,bound}. Construct ≥2 distinct alternatives {id,batches:[{id,units,start,verifyStart,finish}],assessment}. Assess totalUnits,totalCost,maximumOutage,totalOutage,minimumVerification,finishAt,batchCount; constraintFailures lists failed hard criterion IDs; executionIssues lists migration-boundary and/or overlap when present. decision: proposal ID,owner,at,acknowledgements (all three represented parties),grounds (all six source refs),tradeoffs. Decide after session/evidence, before chosen work, within sponsor availability. Each unmet preference needs {criterion,owner,actual,preferred,followup:action ID}; never soften hard criteria. actions: {id,kind:verification/outcome-review,batch,owner,at,source}. One quality-owner/Q05 verification per chosen batch during verification; one product-owner/P8 outcome-review, batch:null, after final finish by 9. Link preference to that review. Two or three batches can work. Save, test and repair without Reset.

What the checks verify

Your work is graded on 10 independent properties, not on matching one reference answer.

  • The facilitation artifact uses bounded finite unique records.
  • All required interests can participate within their access windows.
  • The agenda preserves every actual source bound and separates hard criteria from preference.
  • At least two distinct constructed alternatives have accurate consequence comparisons.
  • The selected work plan satisfies all hard criteria and execution constraints.
  • The supplied sponsor retains the planned decision authority and availability.
  • Represented interests and full evidence close before decision and selected work.
  • Migration completes before each independent verification and reopening.
  • Each selected batch and delivered outcome has an evidence-based owned follow-up.
  • Actual unmet preferences retain their owner and linked follow-up.

Where this sits in the PMP blueprint

Domain
People
Objective
Conflict Resolution
Skill
Conflict Context and Ground Rules

Part of PMP preparation

Labs are written by ExamNova to teach the decisions the exam tests. They are not reproductions of vendor lab content.