Build an operational transition and measured benefits register
A hands-on PMP lab. You produce the real artefact and 10 automated checks verify it behaves the way the exam expects.
- Certification
- PMP
- Format
- Structured configuration
- Difficulty
- hard
- Estimated time
- 40 min
- Automated checks
- 10
The brief
Repair benefits-plan.json. All data/roles are fictional. Required cohorts: north/south. Baselines BN/BS respectively: 100 units,1000 minutes,10 errors,available day 0. Cumulative snapshots (ref:cohort,day,units,minutes,errors): N14:north,14,200,1200,10; N18:north,18,300,1800,12; S14:south,14,200,1100,8; S18:south,18,300,1500,9. Choose ONE snapshot per cohort; never add cumulative cuts. Required handover evidence (acceptance,runbook,training refs and available days): north NA9@9,NR8@8,NT9@9; south SA11@11,SR10@10,ST11@11. Operating owners/windows/daily support cost: north-ops 10–20,$30; south-ops 12–20,$40. Benefit owners: north-benefits/south-benefits. handovers rows {cohort,at,owner,evidenceRefs,supportUntil}; retain both cohorts, hand over by 14 after every required source and within operator window. Fund ≥5 support days, through followupAt, ending by 20; total support cost≤1000. benefits rows {cohort,owner,baselineRef,observationRef,reviewAt,followupOwner,followupAt,baselineMinutes,baselineErrorRate,currentMinutes,currentErrorRate,savedMinutes,estimatedValue}. Snapshot day≥handover+2; review after snapshot/baseline availability by 20. Operator follows up ≥1 day after business owner's review by 20. Rates use source units; savedMinutes=(baseline minutes/unit×current units)−current minutes; estimatedValue=savedMinutes×$2. Zero current units: null current rates,zero savings. Unsupported evidence contributes no aggregate outcomes. aggregate: totalUnits,totalMinutes,totalErrors,minutesPerUnit,errorRate,savedMinutes,grossValue,supportCost,netValue. Weight rates by actual units; supportCost=sum((supportUntil−at)×daily cost), netValue=grossValue−supportCost. Require minutesPerUnit≤6,errorRate≤.05,netValue≥2500. Joint or staged handover and different valid dated reviews can work. Save, test and repair without Reset.
What the checks verify
Your work is graded on 10 independent properties, not on matching one reference answer.
- Unique finite cohort records preserve an editable transition and benefit artifact.
- Both required cohorts remain in the transition scope.
- Current acceptance, runbook and training sources support each handover date.
- Eligible operating ownership covers handover, stabilization support and follow-up within funding.
- Each required cohort has one baseline and one current cumulative snapshot.
- Measurement uses matching sources after handover run-in and source availability.
- Cohort rates, savings and conditional value reconcile to immutable counts and time.
- Business benefit accountability and operating follow-up remain distinct and timely.
- Supported weighted outcomes meet handling, quality and net conditional value requirements.
- The summary weights actual supported units and includes all planned support.
Where this sits in the PMP blueprint
- Domain
- Process
- Objective
- Value Delivery
- Skill
- Incremental Value and Benefits Measurement
Part of PMP preparation
Labs are written by ExamNova to teach the decisions the exam tests. They are not reproductions of vendor lab content.